BUILD IN PUBLIC • BARONFM
Roadmap & Updates
A transparent record of what BaronFM has shipped, what is being prepared, and the long-term targets we are working toward.
22SEP 2026
Android v2.8 preparation and interface cleanup
- Referral code became optional; blank referral entries automatically use BARONFM1.
- Legacy BNB/PI withdrawal minimum was removed and old $50 interface references were cleaned up.
- Old June campaign messaging and previous Ukraine/Turkey campaign sections were removed.
- BaronFM Android application icon was refreshed.
- The unused YouTube Subscribe reward flow was removed to keep the application simpler.
- Legacy admin reward controls were updated so eligible pending rewards can be marked paid.
21SEP 2026
CPDGD reward integration prepared
- CPDGD wallet connection and verified wallet status integrated into the Android app.
- CPDGD rank benefits added for mining bonus percentage and ad multiplier.
- Monthly CPDGD winner reward codes prepared with a 30-day lock and 100% APR campaign setting.
- Reward codes can be copied from BaronFM and activated through the CPDGD website.
- Server UTC reward-period handling was prepared for the October transition.
01OCT 2026
CPDGD monthly reward transition
Target date for new BaronFM monetary rewards to move to the CPDGD reward layer while BARON mining remains active. Existing eligible legacy BNB/PI rewards remain separate from the new period.
NEXTANDROID
Final Android production checks
- CPDGD activation status synchronization after reward activation.
- Final Firestore and security-rules review.
- Final withdrawal-mail and release-readiness checks.
NEXTiOS
Bring BaronFM Android features to iOS
After the Android version is finalized, the goal is to bring the core BaronFM account, mining, radio, reward and CPDGD logic to iOS as closely as practical.
18SEP 2030
Target LP: $1,000,000
Long-term objective for CPDGD liquidity-pool depth. This is a project target, not a guaranteed future value or commitment.
How this page works: completed items are recorded after they are implemented. Upcoming dates and targets represent current plans and may change as development, technical requirements or market conditions evolve.